The City of Courtenay has completed a substantial restoration planting project thanks to $7,500 in grant funding from BC Hydro's Community ReGreening Program.
The project has revitalized habitat areas and tree canopy cover in several Courtenay areas where nature has been impacted over time by our built environment. This effort marks a significant step towards addressing the impacts of disturbance on local natural areas, reinforcing the City's dedication to environmental sustainability.
The main planting focus includes: shoreline habitat restoration at the Riverway Trail along the K'ómoks Estuary, invasive species removal and plant in of canopy cover species at Connector Trail and the Copperfield Trail detention pond, pollinator meadow creation with a focus on reintroduction of indigenous species at Sussex Place and Garry Oak meadow restoration and invasive plant management at Sunrise Park.
By incorporating native and adaptable non-native species, the City aims to develop a resilient urban forest capable of withstanding the challenges posed by longer and drier warm seasons. Invasive and non-native vegetation was removed, and mulch and compost were added.
Over 900 indigenous shrubs and trees, were planted in the fall of 2024 in designated areas. Plants were selected based on current local conditions and the impacts of our changing climate.
The City's commitment extends beyond planting. The Parks Division has designed an ongoing maintenance plan to nurture the newly established trees and shrubs, including monitoring, targeted irrigation, replenishing mulch, ongoing invasive plant removal, and selective pruning.